| - ILLINOIS POLLUTION CONTROL BOARD
February 4, 2010DYNEGY MIDWEST GENERATION, INC.- The NPDES permit was issued by the Illinois Environmental Protection Agency
(Agency) on December 9, 2009, for the Wood River Power Station, an electric generating stationowned and operated by Dynegy.- at 4-5, 6.
- On January 21, 1010, the Board
accepted the permit appeal for hearing, but reserved ruling on the motion to stay, pending anyresponse from the Agency.- Adm.
- Code 101.500(d). The Agency has filed no response to Dynegy’s request for a stay. The stay remains in effect until the Board takes final action on
the permit appeal or until the Board orders otherwise. |