| - BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
IN THE MATTER OF: )) AMEREN ASH POND CLOSURE RULES ) R09-021(HUTSONVILLE POWER STATION) ) (Rulemaking— Land)PROPOSED: 35 Ill.- 2009.
- 1) In a letter dated November 3, 2009, Ameren accused PRN of attempting to mislead the
Illinois Pollution Control Board (Board) by discussing potential impacts of groundwatercontamination on a nearby landowner.- An antidegradation analysis will only
be meaningful if conducted now, before costly capital investments have been made into theproject.- Approval of the rule will result in the release of
additional pollutants into the... |
| Allowed |
| |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| R09-21,113009 PC 6 Addl Cmts PRN.pdf |
| No |
| 1 |
| 245615 |
| |
| |
| No |
Appears In:
|
R2009-021
|
Preferred Version:
|
R09-21,113009 PC 6 Addl Cmts PRN.pdf
|