September 17, 2009PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
PAR DEVELOPMENT, INC., an Illinois
corporation,Respondent.
For the
reasons below, the Board directs the Clerk to provide public notice of the parties’ stipulation,proposed settlement, and request for relief from the hearing requirement.
Adm.
Code 309.102(a)), and conditions of the National
Pollutant Discharge Elimination System (NPDES) general stormwater permit.
Unless the Board determines that a hearing is needed, the Board must cause notice of the
stipulation, proposed settlement, and request for relief from the hearing requirement. Adm. Code 103.300(b), (c). The Board di...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf