View Properties

PCB 10-005 Order 072309
Handle: Document-65888
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Monday, July 27, 2009 11:01:56 AM CDT
Monday, July 27, 2009 11:02:08 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
July 23, 2009DICKERSON PETROLEUM, INC.,Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • If the Agency disapproves or modifies a submittal, the UST owner or
operator may appeal the decision to the Board.
  • See 35 Ill.
  • Adm.
  • Code 105.412. 2002).
2Hearings will be scheduled and completed in a timely manner, consistent with thedecision deadline (see 415 ILCS 5/40(a)(2) (2008)), which only Dickerson may extend by waiver(see 35 Ill. Therecord must comply with the content requirements of 35 Ill.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 10-005 Order 072309.pdf
No
1
26250
No
Appears In: PCB 10-005
Preferred Version: PCB 10-005 Order 072309.pdf