View Properties

PCB 10-7, 072009 Petition for Review
Handle: Document-65764
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Tuesday, July 21, 2009 11:10:31 AM CDT
Tuesday, July 21, 2009 11:10:42 AM CDT
Modified By:
Locked By:
  • BEFORE THE POLLUTION CONTROL BOARD
OF THE STATE OF ILLINOISONKEN'S, INCORPORATED,Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • In 2008, a release was reported from a heating underground
storage tank at the facility and the release was assigned lEMA Incident #20080544.
  • 5.
  • On June 16,2009, the Agency rejected the Site Investigation Completion Report
and Stage 1 Actual Costs, stating as follows:The Amended 45-Day Report received September 28, 2008, contained therequired information needed for closure of this site.
  • In particular, the monitoring wells developed for the site in October of 2008 were necessary to
conduct the groundwater investigation requi...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 10-7, 072009 Petition for Review.pdf
No
1
838029
No
Appears In: PCB 10-007
Preferred Version: PCB 10-7, 072009 Petition for Review.pdf