| ILLINOIS POLLUTION CONTROL BOARDJune 4, 2009IN THE MATTER OF:PETITION OF ROYAL FIBERGLASSPOOLS, INC.- A hearing date will be set when the parties decide how
much time will be needed to prepare these documents.- (a) Are there other states where Royal Fiberglass Pools, Inc.
- 7.
- In general, the most recent data provided appears to be from 2005.
- (a) Would you please explain the difference in the “maximum hourly baseline” and
the “hourly potential-to-emit” and indicate which the chart in Section 2 isdepicting? |