View Properties

PCB 09-25,022709 PtnrPstHrngBrf
Handle: Document-64373
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Monday, March 2, 2009 12:56:33 PM CST
Monday, March 2, 2009 12:56:56 PM CST
Modified By:
Locked By:
  • BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
CITY OF JOLIET,Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCYRespondent.
  • As set out in the Respondent's opening brief, the burden of proof rests with the Petitioner and
Petitioner has failed in meeting its burden.
  • Additionally, Petitioner never shows where the removed topsoil will end up.
  • However, when the City ofJoliet'spublic water supply started removing radium from
the drinking water, and sending it directly to the POTW, the radium levels in the bio-solids and theappropriate levels at which radium could be permitted in the soils became issues for the Petitionerand the Illinois EPA.
  • (Petitioner's Brief, pgs. 6, 7-9,...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 09-25,022709 PtnrPstHrngBrf.pdf
No
1
523239
No
Appears In: PCB 09-025
Preferred Version: PCB 09-25,022709 PtnrPstHrngBrf.pdf