The People further allege that Carlyle North violated these provisions by constructing and
installing a water main and flush hydrant without a construction permit, failing to have a certifiedoperator for some nine months, and failing to maintain and submit records (including onecoliform sample report, and from October 2004 to the present, monthly operating reports, andmonthly operating records for chlorination and fluoride).
On September 19, 2008, the Pe...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf