View Properties

PCB 09-008 Order 09/30/08 (Linzini pub.order)
Handle: Document-62856
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Thursday, October 9, 2008 02:29:13 PM CDT
Thursday, October 9, 2008 02:30:55 PM CDT
Modified By: Brown, Don (User-14, brownd:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 30, 2008PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
  • LENZINI EXCAVATING COMPANY, an
Illinois corporation,Respondent.
  • See 415 ILCS 5/31 (2006); 35 Ill.
  • See People v.
  • Red Seal Development Corp.
  • and Lenzini
Excavating Co., PCB 09-8 (Sept. Unless the Board determines that a hearing is needed, the Board must cause notice of thestipulation, proposed settlement, and request for relief from the hearing requirement. IT IS SO ORDERED.I, John Therriault, Assistant Clerk of the Illinois Pollution Control Board, certify that theBoard adopted the above order on September 30, 2008, by a vote of 4-0.___________________________________Joh...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 09-008 Order 093008 (Linzini pub.order).pdf
No
4
21225
No
Appears In: PCB 09-008
Preferred Version: PCB 09-008 Order 093008 (Linzini pub.order).pdf