August 7, 2008PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
RED SEAL DEVELOPMENT
CORPORATION, an Illinois corporation, andLENZINI EXCAVATING COMPANY, anIllinois corporation,Respondents.
Adm.
Code 103.
In this case, the People allege that respondents violated Sections 12(a), (b), (d), and
(f) of the Act (415 ILCS 5/12(a), (b), (d), (f) (2006)), Sections 302.203, 309.102(a), and309.202(a) of the Board’s water pollution regulations (35 Ill.
See 35 Ill. Adm. Code 103.204(c), (f),
103.212(c). A respondent’s failure to file an answer to a complaint within 60 days afterreceiving the complaint may have severe consequences. If a complainant p...