Dynegy appeals many permit conditions it alleges the Agency has inappropriately
included, citing a variety of grounds.
Adm.
Code 105.214(a).
Hearings will be scheduled and
completed in a timely manner, consistent with the decision deadline (see 415 ILCS 5/40(a)(2)(2006)), which only Dynegy may extend by waiver (see 35 Ill.
35 Ill. Adm. Code 105.212(a). If the Agency wishes to seek
additional time to file the record, it must file a request for extension before the date on which therecord is due to be filed. IT IS SO ORDERED.I, John T. Therriault, Assistant Clerk of the Illinois Pollution Contro...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf