December 6, 2007IN THE MATTER OF:PROCEDURES REQUIRED BY P.
A.
94-849
FOR REPORTING RELEASES OFRADIONUCLIDES AT NUCLEAR POWERPLANTS: NEW 35 Ill.
Finally, the Board will discuss the rule proposed for first notice.
1).
The Board held two hearings in this proceeding before Hearing Officer Marie Tipsord. Id. A number of other nuclear power plants had also experienced tritium leaks, which resulted in
groundwater contamination. Prop. Section 1010.200. The proposal gives the proper procedure for reporting thereleases, including the appropriate reporting phone numbers for the Agency and IEMA as well asinstructions on electronic reporting.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf