Because the postmark date of the joint request is within the time for filing,
the joint request was timely filed.
The Agency
modified the proposed budget for a corrective action plan for remediation of a leakingunderground storage tank located at 2218 Seneca Drive, Charleston, Coles County. See415 ILCS 5/40(a)(1) (2006); 35 Ill. IT IS SO ORDERED.I, John T. Therriault, Assistant Clerk of the Illinois Pollution Control Board, certify thatthe Board adopted the above order on July 12, 2007, by a vote of 4-0.____________...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf