| - F.O.
- Box 621 Alton, IL 62002
(p) 618-467-2265 (f) 618-466-6167May 15, 2007Illinois Pollution Control BoardAttention: Clerk100 West Randolph St.increase productivity in a struggling agricultural industry.- The project included a fifteen-acre wetland enhancement structure
above the lake to trap sediment.- Operation of such a facility would involve
dredging material from the lagoons, loading it on trucks, and transporting the material to a specialwaste landfill .- In addition to the transportation costs, there would also be tipping fees, at the
landfill, it would consume precious landfill space and the parade of trucks would create... |