View Properties

PCB 06-194 Order 10/19/2006
Handle: Document-54784
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Thursday, October 26, 2006 12:24:00 PM CDT
Thursday, October 26, 2006 12:24:43 PM CDT
Modified By: Brown, Don (User-14, brownd:DocuShare)DS
Saturday, December 30, 1899 12:00:00 AM CST
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 19, 2006DYNEGY MIDWEST GENERATION, INC.
  • The construction permit application concerns Dynegy’s coal-fired electric generating
station located at 2150 North County Road, Oakwood, Vermilion County.
  • Because the permit incorporates many conditions that Dynegy is currently challenging in
another permit appeal (Dynegy v.
  • IEPA, PCB 06-73), Dynegy challenges their inclusion in the
construction permit, and asks the Board to stay the effectiveness of those conditions.
  • Adm.
  • Code
105.112(a). Hearings “will be based exclusively on the record before the Agency at the time thepermit or decision was issued.” 35 Ill. 35 Ill. Adm. Code 105.116. The re...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 06-194 Order 101906.pdf
4
24440
No
Appears In: PCB 06-194
Preferred Version: PCB 06-194 Order 101906.pdf