The Agency granted the Village of Hampshire’s request for an NPDES permit
modification to allow an increase in the facility’s design average flow (DAF) and designmaximum flow as a result of a plant expansion.
Mr.
Brazas appealed on the grounds that: (1) the issued permit violates public notice
requirements; (2) the Agency and the Village of Hampshire failed to perform a study assuringthat the increase in discharge will not cause a violation of any other applicable water qualitystandard as required by Special Condition 5; (3) the permit fails to require monitoring of radiumin the effluent in...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf