REVISIONS TO WATER QUALITY ) STANDARDS FOR TOTAL DISSOLVED ) SOLIDS IN THE LOWER DES PLAINES RIVER FOR)EXXONMOBIL OIL CORPORATION : ) PROPOSED 35 III.
You're familiar with the CITGO variance, right? CITGO and PDVMR
received a Variance for TDS (PCB 05-85) until December 15, 2009 in order to study the neededstorage capacity to insure that water quality standards are met in the receiving stream in theSecondary Contact Waters as well as the General Use waters downstream of their discharge .
If the IPCB g...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf