View Properties

pcb 06-131 iepa2 brief 06/09/06
Handle: Document-52789
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Friday, June 9, 2006 12:39:25 PM CDT
Friday, June 9, 2006 12:39:57 PM CDT
Modified By: Brown, Don (User-14, brownd:DocuShare)DS
Locked By:
  • BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
WESLEY BRAZAS, JR., ) RECEIVEDPetitioner ) CLERK'S OFFICEV.
  • ) PCB 06-131
JUN 0 9 2006STATE OF ILLINU]bMR.
  • Brazas' amended petition .
  • II.
  • Brazas has failed to cite any support for the proposition that permit limits
must correspond according to the typical mathematical equation .
  • In fact, no State or federal
statute or regulation includes such a requirement. The Illinois EPA responded to theapplication by issuing a draft permit and Public Notice Fact Sheet. Brazas has failed to prove that the public notice for the permit at issue (NPDESpermit IL0020281) def...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
pcb 06-131 iepa2 brief 060606.pdf
4
111968
No
Appears In: PCB 06-131
Preferred Version: pcb 06-131 iepa2 brief 060606.pdf