  • BEFORE THE ILLINOIS POLLUTION CONTROL BOA ECEIVED
CLERK'S OFFICEIn the Matter of: ) Clean Construction or Demolition ) R06-19Debris Fill Operations Under P.A.
  • 94-272 ) (Rulemaking-Land)
(35111.
  • As a solution to this problem, Vulcan suggests adoption of a two-pronged approach
consisting of performing environmental due diligence on the proposed fill material, andtesting the material only if the due diligence turns up evidence that the fill has beenimpacted by a spill or release .
  • When testing is required, the results would be compared to
numerical limits to be established by IEPA, and the material used as clean fill only if ...