View Properties

PCB 06-086 Order 12/15/05
Handle: Document-50375
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Tuesday, December 20, 2005 11:41:16 AM CST
Tuesday, December 20, 2005 11:54:15 AM CST
Modified By: Brown, Don (User-14, brownd:DocuShare)DS
Saturday, December 30, 1899 12:00:00 AM CST
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
December 15, 2005PROSISE OIL COMPANY(Incident #982486),Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • Adm.
  • Code
105.402, 105.406.
  • Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
  • The Agency rejected
the amended high priority corrective action plan budget for Prosise Oil Company’s leakingunderground petroleum storage tank facility located at Dix and Irvington Road, Dix, JeffersonCounty. See 415ILCS 5/40(a)(1) (2004); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above ord...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 06-086 Order 121505.pdf
4
21321
No
Appears In: PCB 06-086
Preferred Version: PCB 06-086 Order 121505.pdf