View Properties

PCB 78-186,041681 O&O
Handle: Document-47404
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Tuesday, April 26, 2005 08:49:52 AM CDT
Tuesday, April 26, 2005 08:50:07 AM CDT
Modified By:
Saturday, December 30, 1899 12:00:00 AM CST
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
April 16, 1981ILLINOIS ENVIRONMENTAL PROTECTIONAGENCY, Complainant,v.
  • ) PCB 78—186
ERNEST E.
  • HARTMAN,
Respondent.
  • The parties have stipulated
that the facility began operation in 1966 and “was terminatedby August, 1974 “ (R 131).
  • Chapter 7 became effective July 27,
1973.
  • In mitigation it is stipulated that Hartman has not made substantial
profits as a result of his failure to comply. In making its decision the Board has considered the factorsenumerated in Section 33(c) of the Act. The frequency of sampling shall be determined by the Agency.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 78-186,041681 O&O.pdf
4
223079
No
Appears In: PCB 78-186
Preferred Version: PCB 78-186,041681 O&O