View Properties

R99-008 12/17/98 Order
IN THE MATTER OF: PERMITTING PROCEDURES FOR THE LAKE MICHIGAN BASIN 35 Ill. Adm. Code 301, 309.141
Handle: Document-4702
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, April 5, 2001 01:56:17 PM CDT
Tuesday, January 22, 2002 01:44:33 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
December 17, 1998IN THE MATTER OF:PERMITTING PROCEDURES FOR THELAKE MICHIGAN BASIN 35 Ill.
  • And on November
19, 1998, the Illinois Environmental Protection Agency (Agency) filed a response to the IERGmotion.
  • IERG maintains that
the Board has no authority in this proceeding to determine the Agency’s rulemaking authority.
  • The
Agency’s rulemaking proposal contains proposed amendments to the Board’s water rules thatwill clarify implementation of the federally required Great Lakes Initiative.
  • Thus, the Board can adopt or not adopt the proposed rules on the
merits based on the Board’s own authority to adopt the rules proposed by the Agency.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
r99008.pdf
4
8953
No
Appears In: R 99-008
Preferred Version: R99-008 12/17/98 Order