View Properties

HO05-013030905
Handle: Document-46824
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, March 10, 2005 12:07:54 PM CST
Thursday, March 10, 2005 12:08:27 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
March 9, 2005PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
  • PAUL DIFRANCO, SR., an Illinois resident,
and MARK’S CONSTRUCTION, INC., anIllinois corporation,Respondents.
  • The parties represented that a stipulation and proposal for settlement (stipulation)
is being circulated for review and signatures.
  • At the status conference, the parties must be prepared to discuss the status of
the above-captioned matter and their readiness for hearing.
  • IT IS SO ORDERED.
  • Bradley P. Halloran
Hearing OfficerIllinois Pollution Control BoardJames R. Thompson Center, Suite 11-500100 W. Randolph StreetChicago, Illinois 60601312.814.8917
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
HO05-013030905.pdf
4
18113
No
Appears In: PCB 05-013
Preferred Version: HO05-013030905