For this reason, our primary interest in the Illinois Pollution Control Board
(IPCB) rule-making process is to be assured that limits are based upon thebest scientific studies available.
That supplier
is now faced with potentially meeting a discharge limit that is 5 times asstrict as the national drinking water standard at the same time they arefaced with installing treatment to comply with the drinking water standard.
Nonetheless, if there is a desire to address worker safety at POTW’s in this
procedure, it should be noted that the primary concern is exposure toradium after ingestion or, to a less...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf