  • ILLINOIS POLLUTION CONTROL BOARD
July 8, 1998ILLINOIS POWER COMPANY(Baldwin Power Station),Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • The Agency recommends that the Board grant the requested provisional
variance with specified conditions.
  • Adm.
  • Code 304.120 and 304.141(b).
  • This
variance period is recommended to commence when the maintenance work has begun and tocontinue until the wastewater treatment facility returns to compliance, but not longer than 45days. This varianceshall continue until the wastewater treatment facility returns to compliance, butnot longer than 45 days. ___________________________Petitioner___________________________A...
Allowed