Because the postmark date of the joint request is within the time for filing, the joint
request was timely filed.
The Agency modified
petitioner’s high priority corrective action plan and budget for SG Supply’s leaking undergroundpetroleum storage tank facility located at 12900 South Throop Street, Calumet Park, CookCounty. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on July 8, 2004, by a vote of...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf