Sections 40 and 57.7(c)(4)(D) ofthe Illinois Environmental Protection Act, which allows anextension ofthe time that an applicant can petition the Illinois Pollution Control Board (“Board”)for a hearing from 35 days to 90 days.
Specifically, in its final decision, the Illinois
EPA denied “$23,820.00 for proposed concrete replacement” and “$68,680.00 for sewer linerepair, water line repair, gas line repair, fence replacement, removal and installation ofstorageracks, and shoring ofsewer line.” While the Illinois EPA asserted that the costs did not meet theeligibility requirem...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf