View Properties

PCB 04-221,061604 Ltr2IEPASJM
Handle: Document-43128
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, June 23, 2004 09:06:43 AM CDT
Wednesday, June 23, 2004 09:10:57 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • R~C~IIVEDCLERK’S OFFICE
JUN 1 6 2004Pollutiofl~P~R~i~.STATE OF ~LL~NO~SC.
  • This request is made pursuant to
Sections 40 and 57.7(c)(4)(D) ofthe Illinois Environmental Protection Act, which allows anextension ofthe time that an applicant can petition the Illinois Pollution Control Board (“Board”)for a hearing from 35 days to 90 days.
  • Specifically, in its final decision, the Illinois
EPA denied “$23,820.00 for proposed concrete replacement” and “$68,680.00 for sewer linerepair, water line repair, gas line repair, fence replacement, removal and installation ofstorageracks, and shoring ofsewer line.” While the Illinois EPA asserted that the costs did not meet theeligibility requirem...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 04-221,061604 Ltr2IEPASJM.pdf
4
110027
No
Appears In: PCB 04-221
Preferred Version: PCB 04-221,061604 Ltr2IEPASJM