Agency recommends that the Board grant the requested provisional variance with specifiedconditions.
This variance period is
recommended to commence on March 18, 1998, when the first excess flow discharge eventthrough Outfall 003 occurred, and is to continue for 45 days, or until the transfer piping repairis complete, whichever occurs first.
Adm.
Code 305.102(b) and 304.141, subject to the following conditions:
1. The term of this provisional variance shall commence on March 18, 1998, whenthe first excess flow discharge event through ...