View Properties

PCB 04-145 Order 04/01/04
GREAT LAKES DREDGE & DOCK COMPANY v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
The Board accepted PCB 04-145 for hearing. The Board granted petitioner’s motion to consolidate this underground storage tank appeal involving a Cook County facility with PCB 04-143.
Handle: Document-42083
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Wednesday, April 7, 2004 03:11:40 PM CDT
Friday, August 13, 2004 11:55:56 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
April 1, 2004GREAT LAKES DREDGE & DOCKCOMPANY,Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • PCB 04-143 contests the Agency’s January 14, 2004 rejection of Great Lakes’ October
2003 first amendment to the Site Investigation Budget.
  • The Board accepts the amended petition in
PCB 04-145 for hearing.
  • Hearings will be scheduled and completed in a
timely manner, consistent with the decision deadline (see 415 ILCS 5/40(a)(2) (2002)), whichonly Great Lakes may extend by waiver (see 35 Ill.
  • See 35 Ill. Adm. Code 105.116.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
04-145040104.pdf
4
16784
No
Appears In: PCB 04-145
Preferred Version: PCB 04-145 Order 04/01/04