Title: PCB 04-145 Order 04/01/04
Summary: GREAT LAKES DREDGE & DOCK COMPANY v.
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Description: The Board accepted PCB 04-145 for hearing. The Board granted petitioner’s motion to consolidate this underground storage tank appeal involving a Cook County facility with PCB 04-143.
Keywords:
Handle:
Document-42083
Owner:
Brown, Don (User-14, brownd:DocuShare)DS
Create Date: Wednesday, April 7, 2004 03:11:40 PM CDT
Modified Date: Friday, August 13, 2004 11:55:56 AM CDT
Modified By:
Expiration Date:
Locked By:
Abstract: ILLINOIS POLLUTION CONTROL BOARD April 1, 2004GREAT LAKES DREDGE & DOCKCOMPANY,Petitioner,v.PROTECTION AGENCY,Respondent. PCB 04-143 contests the Agency’s January 14, 2004 rejection of Great Lakes’ October 2003 first amendment to the Site Investigation Budget. The Board accepts the amended petition in PCB 04-145 for hearing. Hearings will be scheduled and completed in a timely manner, consistent with the decision deadline (see 415 ILCS 5/40(a)(2) (2002)), whichonly Great Lakes may extend by waiver (see 35 Ill. See 35 Ill. Adm. Code 105.116.
Add Versions: Allowed
Author:
Content Type:
Adobe Portable Document Format (.pdf) - application/pdf
File name: 04-145040104.pdf
Is Placeholder:
Max Versions: 4
Size: 16784
Copied From:
Last Synchronized:
Ready for Declare: No
Appears In:
PCB 04-145
Preferred Version:
PCB 04-145 Order 04/01/04