Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
The Agency approved
petitioner’s high priority corrective action plan, with modifications, for AJ Oil Company’sleaking underground petroleum storage tank facility located at 5723 West Plank Road, Bellevue,Peoria County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on January 2...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf