Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
At issue is the
Agency’s approval of the high priority corrective action plan and high priority corrective actionplan budget, with modifications, for Paul Phelan’s leaking underground petroleum storage tankfacility located at 1008 North Main Street, Brighton, Macoupin County. See 415 ILCS 5/40(a)(1) (2002); 35Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certi...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf