Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
At issue is the
Agency’s approval of reimbursement of requested corrective action costs, with modifications, forLemont Kar Gas’s leaking underground petroleum storage tank facility located at 127th Streetand 1196 State Street, Lemont, Cook County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf