View Properties

PCB 04-26,102003 RspndntRspnsCmplntRspns
Handle: Document-40410
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, October 21, 2003 09:33:07 AM CDT
Tuesday, October 21, 2003 09:33:50 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • fill Rl~C~
1,tate 0 ~OIS CLERKS OFFICEPollution Control Board100W.
  • If Van Someren did so, I ask that proof be shown ofconfirmation ofmailing via a
tracking receipt ofhis submission to this party within the time specified (i.e.
  • prior to
10/16/03).
  • I therefore request that the board consider this motion at the November 6
hearing as the delay was due to failure on the Respondent’s compliance.
  • Ifthere is any doubt to.
  • the noise levels, I can provide valid
proof at hearing ofactual documentation from inside our neighboring property ofexcessive and prolonged noise generated from the construction. That isnot to saythat the noise ~ exempted*crn ,...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 04-26,102003 RspndntRspnsCmplntRspns.pdf
4
416182
No
Appears In: PCB 04-026
Preferred Version: PCB 04-26,102003 RspndntRspnsCmplntRspns