Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
At issue is the
Agency’s approval of the high priority site investigation corrective action plan, withmodifications, for Piasa Motor Fuels’ leaking underground petroleum storage tank facilitylocated at Highway 270 and Route 111, Mitchell, Madison County. See 415 ILCS 5/40(a)(1) (2002);35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf