Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
At issue is the
Agency’s approval, with modifications, of a high priority corrective action plan for Svacina’sleaking underground petroleum storage tank facility located at 5944 Lincoln Avenue, MortonGrove, Cook County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on September...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf