Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
At issue is the
Agency’s approval of the high priority site investigation corrective action plan, withmodifications, for Wei Enterprises’ leaking underground petroleum storage tank facility locatedat 529 Maple Street, Shiloh, St. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf