Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
At issue is the
Agency’s denied reimbursement of requested corrective action costs for Wei Enterprises’ leakingunderground petroleum storage tank facility located at 529 Maple Street, Shiloh, St. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on September 4, 2003, by a vote of ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf