View Properties

PCB 03-224 Opinion and Order 09/04/03
PEOPLE OF THE STATE OF ILLINOIS v. VILLAGE OF SIMS, an Illinois municipal corporation, FOLLOWELL CONSTRUCTION COMPANY, INC., an Illinois corporation, and LAMAC ENGINEERING COMPANY, an Illinois corporation
In this public water supply enforcement action concerning a Wayne County facility, the Board granted relief from the hearing requirement of Section 31(c)(1) of the Environmental Protection Act (415 ILCS 5/31(c)(1) (2002)), and accepted three separate final stipulation and settlement agreements. The Village of Sims agreed to pay a $500 civil penalty, while Followell Construction Company, Inc. and Lamac Engineering Company agreed to pay a $5,000 civil penalty each. The respondents were ordered to cease and desist from further violations.
Handle: Document-40067
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Tuesday, September 9, 2003 02:52:31 PM CDT
Friday, October 24, 2003 11:05:36 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 4, 2003PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
  • VILLAGE OF SIMS, an Illinois municipal
corporation, FOLLOWELLCONSTRUCTION COMPANY, INC., anIllinois corporation, and LAMACENGINEERING COMPANY, an Illinoiscorporation,Respondents.
  • Each of the three stipulations and proposed settlements was accompanied by a motion for
relief from the hearing requirement of Section 31(c)(1) of the Act (415 ILCS 5/31(c)(1) (2002),amended by P.A.
  • 93-152, eff.
  • July 10, 2003; 35 Ill.
  • Adm. Each stipulation also addresses the factors of Section 42(h) of the Act (415 ILCS 5/42(h)
(2002), amended by P.A. 93-152, eff. 3. Each respondent must pay ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 03-224 Opinion and Order 090403.pdf
4
15531
No
Appears In: PCB 03-224
Preferred Version: PCB 03-224 Opinion and Order 09/04/03