PCB 99-127 Opinion & Order 07/24/03
TED HARRISON OIL COMPANY v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
The Board reversed Environmental Protection Agency’s denial of reimbursement to petitioner for corrective action activities, and directed payment of $116,300 from the Underground Storage Tank Fund.
Handle: Document-39669
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, July 31, 2003 04:46:04 PM CDT
Friday, August 15, 2003 11:02:28 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
July 24, 2003TED HARRISON OIL COMPANY,Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • 1 The transcript from the November 6, 2002 hearing will be cited as “Tr.
  • Id.
  • The corrective action plan also
proposed excavating all accessible impacted soils during a single period of field work andequipment mobilization, with a temporary stockplile of petroleum impacted soils placed at aseparate land treatment site.
  • Tech. R. at 344. Harrison Oil
received a permit (No. Specifically, the duties of the HES employees included beingon the site from at least 8 a.m. until 4 p.m., acting as safety officers, maintaining the road toavoid d...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 99-127 Opinion & Order 072403.pdf
4
47989
No
Appears In: PCB 99-127
Preferred Version: PCB 99-127 Opinion & Order 07/24/03