TED HARRISON OIL COMPANY v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
The Board reversed Environmental Protection Agency’s denial of reimbursement to petitioner for corrective action activities, and directed payment of $116,300 from the Underground Storage Tank Fund.
July 24, 2003TED HARRISON OIL COMPANY,Petitioner,v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
1 The transcript from the November 6, 2002 hearing will be cited as “Tr.
Id.
The corrective action plan also
proposed excavating all accessible impacted soils during a single period of field work andequipment mobilization, with a temporary stockplile of petroleum impacted soils placed at aseparate land treatment site.
Tech. R. at 344. Harrison Oil
received a permit (No. Specifically, the duties of the HES employees included beingon the site from at least 8 a.m. until 4 p.m., acting as safety officers, maintaining the road toavoid d...