View Properties

PCB 01-155 Opinion and Order 07/10/03
PEOPLE OF THE STATE OF ILLINOIS v. ALLOY ENGINEERING AND CASTING COMPANY
In this Resource Conservation and Recovery Act, air, and water enforcement action concerning a Champaign County facility, the Board granted relief from the hearing requirement of Section 31(c)(1) of the Environmental Protection Act (415 ILCS 5/31(c)(1) (2002)), accepted a stipulation and settlement agreement, ordered the respondent to pay a total civil penalty of $75,000, and to cease and desist from further violations.
Handle: Document-39535
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Thursday, July 17, 2003 03:01:14 PM CDT
Monday, July 28, 2003 01:19:17 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
July 10, 2003PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
  • ALLOY ENGINEERING AND CASTING
COMPANY,Respondent.
  • Adm.
  • Code 201.141, 212.301) by
emitting particulate matter and not controlling fugitive dust.
  • Adm.
  • Code 703.121(a),
703.150(a), 722.134, 725.115(a), (b), 725.116, 725.133, 725.137, 725.151(a), 725.153, 725.155,725.173(a), 725.212(a), 725.242(a), 725.243(a), 725.274)). Comp. at 7-8.According to the stipulation, the alleged violations were “distinct in nature” and occurredfrom 1999 through 2001. If Alloy fails to perform the SEPs as required, it agrees to pay an additional civil penalty of$77,501 to the Environmental Protection ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 01-155 Opinion and Order 071003.pdf
4
21925
No
Appears In: PCB 01-155
Preferred Version: PCB 01-155 Opinion and Order 07/10/03