  • ~II~l4~JlOLLUTION CONTROL BOARD
DYNEGY MIDWEST GENERATION, INC.,(BALDWIN POWER STATION)V.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY.
  • 2.
  • Petitioner owns and operates a coal-fired generating station located near
Baldwin, Illinois in St.
  • It wasn’t until after the flows returned to normal and the exceedences
continued, that it was discovered that only 1-2 feetofwater was available for settling, whichis not sufficient for ash clarification.” Exhibit A at 1.
  • The Petitioner further states,
“Baldwin Power Station believes that immediate dredging ofthe secondary pond must beinitiated before flows through the ponds increase again, which would re-suspend even moreash, resulting i...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 03-234,062003 PrvsnlVarncRcmdtn.pdf
4
561215
No
Appears In: PCB 03-234
Preferred Version: PCB 03-234,062003 PrvsnlVarncRcmdtn