  • ILLINOIS POLLUTION CONTROL BOARD
October 17, 1972ENVIRONMENTAL PROTECTION AGENCY ) v.
  • ) PCB 72-199
SOUTHERN ILLINOIS POWER COOPERATIVE ) SOUTHERN ILLINOIS POWER COOPERATIVE ))) v.
  • ) PCB 72-238
)) ENVIRONMENTAL PROTECTION AGENCY )) INTERIM OPINION & ORDER OF THE BOARD (by Mr.
  • The plant is expected to consume 250, 000 tons of coal and 60, 000 gallons
of oil during 1972.
  • SIPC has proposed a time schedule as follows:
Start design May, 1972Sta...
Allowed