Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
At issue is the
Agency’s approval of the reimbursement corrective action plan costs, with deductions, forWarren’s Service’s leaking underground petroleum storage tank facility located at Third & Fifth,Sherrard, Mercer County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on May 1,...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf