Because the postmark date of the joint request is within the time for
filing, the joint request was timely filed.
The
Agency approved payment of requested corrective action plan costs, with modifications, forSwift-T-Food Mart’s leaking underground petroleum storage tank facility located at 1100Belvidere Road, Waukegan, Lake County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order o...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf