Because the postmark date of the joint request is within the time for filing, the
joint request was timely filed.
The Agency approved
the corrective action budget, with modifications, for Gary Lewis’s leaking undergroundpetroleum storage tank facility located at 399 North Page, Aviston, Clinton County. See 415 ILCS 5/40(a)(1)(2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order on April 17, 2003, by a vote of 6-0.D...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf