View Properties

PCB 03-155 Order 04/03/03
ROSIGNOL MARATHON v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
The Board granted this request for a 90-day extension of time to file an underground storage tank appeal on behalf of this McHenry County facility.
Handle: Document-38614
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Tuesday, April 8, 2003 04:59:44 PM CDT
Monday, April 21, 2003 04:11:19 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
April 3, 2003ROSIGNOL MARATHON,Petitioner,v.
  • ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,Respondent.
  • Adm.
  • Code
105.206(c), 105.208(a), (c).
  • Because the postmark date of the joint petition is within the time for
filing, the petition was timely filed.
  • As issue is an
Agency conditional approval of the corrective action plan with modifications of RosignolMarathon’s leaking underground petroleum storage tank facility located at 902 Market Street,Mount Carmel, Wabash County. See 415 ILCS 5/40(a)(1) (2002); 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Boardadopted the above order o...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
PCB 03-155 Order 040303.pdf
4
9216
No
Appears In: PCB 03-155
Preferred Version: PCB 03-155 Order 04/03/03