ENVIRONMENTAL PROTECTION AGENCYOPINION OF THE BOARD (by Mr.
In the Pfanstiehl case (PCB72—37)
the verified petition details that Pfanstiehl made repairs toits sewer discharge lines and completed them in December of1970.
This re—connection was done; however,
on inspection the Agency advised Pfanstiehl that since this wasan additional discharge to the sanitary sewer system sinceMarch 31, 1971, Pfanstiehl would have to apply for a variancefrom the Board’s order previously referred to.
Mr. Stone
now seeks to ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf