| PCB 71-290 01/06/72 Opinion |
| RICHARD ABEL & COMPANY, INC., and ZION STATE BANK AND TRUST CONPANY, as Trustee under Trust No. 135 v. ENVIRONMENTAL PROTECTION AGENCY |
| |
| |
Handle:
|
Document-38466
|
Owner:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Monday, April 7, 2003 02:22:34 PM CDT |
| Thursday, April 10, 2003 09:04:33 AM CDT |
Modified By:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
January 6, 1972RICHARD ABEL & COMPANY, INC., andZION STATE BANK AND TRUST CONPANY,as Trustee under Trust No.- The present location is leased
until 1973 and Abel does not anticipate any problem in renewal ofthe lease.- Construction cost of the new structure will be
in the range of $800~000.00.- The sewer load, in effect, would be doubled by allowing the new
operation, ~and at the same time permitting the availability ofthe old site for continued use.~ Cf.- This Opinion constitutes the findings of fact and conclusions
of law of the Board. |
| Allowed |
| |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| OCR0001.pdf |
| |
| 4 |
| 388873 |
| |
| |
| No |
Appears In:
|
PCB 71-290
|
Preferred Version:
|
PCB 71-290 01/06/72 Opinion
|