View Properties

PCB 71-015R 01/06/72 Lawton Supplemental Order and Opinion
MT. CARMEL PUBLIC UTILITY CO. v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-38462
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, April 7, 2003 02:03:15 PM CDT
Thursday, April 10, 2003 09:03:08 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
January 6, 1972MT.
  • 2.
  • The Utility shall proceed with the following program:
(a) The Utility shall complete the conversion ofBoiler #5 from a coal-fired boiler to a boilerfired by oil and natural gas by March 30, 1973;(b) The Utility shall complete the 69 KV line fromMt.
  • Said bond shall be in
the amount of $500,000.
  • Lastly, the company asserts that the order of the Board
is discriminatory when considered in light of other orders enteredrequiring posting of a bond.
  • PCB71-193, 195, 196, 197, 198.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
361552
No
Appears In: PCB 71-015
Preferred Version: PCB 71-015R 01/06/72 Lawton Supplemental Order and Opinion