View Properties

PCB 71-195 12/09/71 Currie Supplemental Order
ILLINOIS POWER CO. v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-38420
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, April 7, 2003 08:40:18 AM CDT
Tuesday, May 13, 2003 03:19:03 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
December 9, 1971ILLINOIS POWER CO.
  • Currie):
Our order of September iu, 1971, placed limits on theoperation of units 1-3 at the Wood River plant, whose aim wasto petmit use of these extremely offensive units only whenother power sources are unavailable.
  • The Agency has no objection to the
motion.
  • The tests are necessary in order to determine the effectiveness
of the important and relatively new Cat-Ox system, which issignificant not only for the success of this particular installationbut for the nationwide future of sulfur dioxide and particulatecontrol.
  • I, Christan Moffett, Acting Clerk of the Pollution Control Board,
certify that the Boa...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
133766
No
Appears In: PCB 71-195
Preferred Version: PCB 71-195 12/09/71 Currie Supplemental Order